
Pittsburgh Data Center: Purpose-built to power AI and HPC
Discover Ardent’s cutting-edge facility in Pittsburgh, engineered for AI, HPC, and latency-sensitive workloads with up to 135kW+ per rack and energy-efficient cooling.
12
Capacity UPS
PUE
as low as 1.15
ISO 27001
Certification
Why choose Pittsburgh?
Home to globally recognized, top-tier research institutions.
Proximity to East Coast and Midwest markets.
Available clean energy sources, such as hydro and wind.
Close to financial hubs and growing AI ecosystems
Key benefits
135+kW high density computing racks
Designed from the ground up for GPU clusters and large-scale compute, enabling from advanced model training to high-frequency trading environments.
Rapid time-to-deploy
With 2.4MW IT capacity live by June 2025 and a clear path to 12MW IT total by 2027, you can scale in line with your roadmap, without waiting on infrastructure.
Energy efficiency + ESG alignment
Our closed-loop cooling and support for direct liquid cooling (DLC) drastically reduce PUE and footprint, allowing performance and sustainability to coexist.
Technical Specifications
Capacity | 12MW IT Total (2.4MW IT Live June 2025) |
Rack density | Up to 135kW+ per rack |
Cooling | Closed loop + DLC ready |
Certification | ISO 27001 |
Connectivity | Carrier-neutral, 2 Meet-Me Rooms |
Security | Biometric access, 24/7 surveillance |
Redundancy | N+1 Power and Cooling |

Key value
• Rapid scalability, allows fast deployments.
• AI/HPC-focused infrastructure designed for compute-heavy, high-throughput environments.
• High-density racks supported, energy-efficient site design.

Who it’s built for
Whether you‘re fine-tuning models, running quantum simulations, or powering mission-critical enterprise applications, this is the infrastructure advantage.
Designed for organizations pushing the limits of computational possibility, from AI startups and model developers to leaders in manufacturing, energy, life sciences, and biotech, this data center delivers the performance, scale, and reliability they demand.
Use cases
AI/ML model training and inference
High-performance computing used for simulations in science and finance
Hybrid and private cloud environments for regulated industries
Efficiency
We believe performance and sustainability go together. The Pittsburgh facility integrates:
Closed-loop cooling systems
DLC support to reduce environmental impact
Energy efficiency by design (target PUE as low as 1.15)
FAQs
What makes the Pittsburgh data center ideal for AI and HPC workloads?
Our facility was purpose-built for next-gen computing. It supports high-density deployments. It’s ideal for scaling GPU clusters, and data-heavy applications.
What are the power and cooling capabilities?
- Highly efficient mechanical and electrical design (N+1 redundancy)
- Support for flexible Direct-to-chip and RDHx cooling capabilities
Is renewable energy available?
We’re accelerating renewable energy options in the region helping customers meet ESG and sustainability goals without compromising on performance.
Can Ardent support custom infrastructure or GPU clusters?
Ardent Pittsburgh data center is designed to support custom infrastructure including high-density GPU clusters tailored for AI and HPC workloads along with data-heavy applications.
How secure is the Pittsburgh site?
The data center features 24/7 physical security, multi-factor access control, CCTV monitoring, and options for customer-specific access requirements. It is designed to support enterprise-grade and regulatory-compliant deployments.
Is this site compliant with industry standards?
Pittsburgh facility is ISO 27001 certified, demonstrating a strong commitment to information security management.
How do I get started?
Fill out our contact form to schedule a call with our infrastructure team. We’ll review your technical needs and deployment timeline, then propose a tailored solution.
How does customer support work?
Ardent customer portal enables seamless monitoring and ticketing for a quick and clean experience.
